Skip to main content

ISO 9001:2015 certified

Contracting Services

HT / LT Panel Installation

Installation of HT and LT panels on site by our own trained crews.

High-voltage test being carried out on a panel

Overview

Trident Core Energy installs HT and LT panels on site with its own trained crews.

We design, fabricate and test our panels, compact substations, bus ducts and cable trays at our own plant in Greater Noida, so the same team that builds the equipment can install and commission it.

We also carry out supply, installation, testing and commissioning of VCB panels and ring main units (RMU), and of electrical panels to the same standards as our factory tests.

Scope of work

  1. 1Site survey and installation planning
  2. 2Mechanised erection and positioning of the panels
  3. 3Cable termination and interconnection
  4. 4Testing to the same standards as our factory tests
  5. 5Commissioning and handover

Equipment we manufacture for this work

Trident main LT control panel with multiple compartments and metering

LT Panels & Switchboards

Main LT Panel

Compartmentalised, bolted LT control panels custom-built for power distribution in modern plants and buildings.

View details: Main LT Panel
Colour-coded PCC line-up with green, blue, red and orange sections

LT Panels & Switchboards

Power Control Centre (PCC)

Modular panels that control and distribute power to heavy machinery, motors and transformers in large facilities.

View details: Power Control Centre (PCC)
Motor control centre panel with rows of starter feeders and indicator lamps

LT Panels & Switchboards

Motor Control Centre (MCC)

Assemblies of MCCBs, contactors, overload relays and MPCBs for reliable motor control, including intelligent MCCs.

View details: Motor Control Centre (MCC)
Automatic power factor correction panel line-up with capacitor feeder modules

Power Factor & Power Quality

APFC Panel

Automatic power factor correction that switches capacitors with the load to avoid wasted energy and penalties.

View details: APFC Panel

How We Deliver

One team from design to commissioning

Design, manufacturing, erection, commissioning and installation, all handled by Trident.

  1. Step 1: Design

    AutoCAD design to the latest Indian electrical and panel standards.

  2. Step 2: Manufacturing

    In-house CNC fabrication, powder coating and assembly at our Greater Noida plant.

  3. Step 3: Inspection & Testing

    Insulation, high-voltage, functional and injection testing before dispatch.

  4. Step 4: Erection & Installation

    Mechanised erection by well-trained, experienced crews.

  5. Step 5: Commissioning

    Testing and commissioning on site, then handover.

FAQs

HT / LT Panel Installation: common questions

Ask our engineers

Get in Touch

Tell us about your site

Share the scope, location and timeline. Our engineers will plan the work and send a proposal.

Ratings, quantities or scope, e.g. 1600 A PCC with 2 incomers, or 300 m cable tray

Your details are used only to respond to your enquiry. We never sell your information.

Planning a panel, substation or electrical project?

Share your single-line diagram, load details or BOQ. Our engineers will review it and come back with the right configuration and a quotation.